french manicure case study personal statement for food and beverage assistant tamil essay competition topics contoh essay motivasi mengikuti organisasi example abstract master thesis describe the purpose of introduction of a business plan sherlock wedding speech youtube the great gatsby love or obsession essay

Home » Remediation Projects

Sustainable Technologies has completed hundreds of remediation systems in Northern California.

Alameda Point
Location: Alameda, CA
System: Installation of an off-grid AS-SVE system
for groundwater treatment operations on the former Naval Base
Date: Fall 2013 – Spring 2014
Client: Tetratech and U.S. Navy
Case Study: Case Study Green Remediation
Additional Sites at Alameda Point: Navy cleans long-gone gas stations
Leviathan Mine
Location: Alpine, CA
System: Installation of an off-grid hybrid electrical
power generation system for groundwater treatment operations
at a Region 9 superfund site.
Date: Nov 2007
Client: Amec Geomatrix & EPA
Soil Bio Venting System
• 50″ of H2O vacuum, 3HP blower
• 80 gal. KO tank w/pump and level controls
• Very quiet operation
Rohnert Park
Location: 5750 Commerce Blvd.
System: Multi-Phase Extraction
Date: Jan 2009
Client:Cameron-Cole / Safety Kleen
Pittsburg
Location: 3590 Railroad Ave.
System: Ground Water Treatment System
Date: March 2009
Client: CRA / Linscheid Superior Car Wash
Woodland
Location: 45332 County Road 25, Woodland, CA
System: Oxidizer Installation, Dual Phase Extraction
Date: March 2009
Client: CRA / Conoway Ranch

See a map of our projects: view map

See our Remediation Rentals